Travis Air Force Base Jet Fuel Storage Tanks
Contract Value: $336,000
Project Completed: 2004
Work on this project consisted of the demolition of Building 550 as well as three above-ground 60' tall jet fuel storage tanks at the Air Force Base. The work included demolishing and removing all steel tank material as well as the concrete perimeter footing for the three above-ground storage tanks.
Building 550 was a one and two-story wooden structure with a slab on grade floor. All concrete was processed on site and run through a crusher plant for reuse.