Site Remediation, Willits, California

Contract Value:        $1,800,000
Project Completed:    2003


This project involved the excavation and stockpiling of Class II material, transportation, and disposal.  Excavating impacted soil required installation of shoring to support the building, removal of a portion of its siding and roof, and removal of its structural supports. A sheetpile shoring and whaler system was installed around the perimeter of the excavation area to achieve an excavation depth of 22'.  The impacted soil was stockpiled on-site then transported to an appropriate facility.  The excavation pit was was then backfilled with a blend of imported sand and iron filings.  Other aspects of this project included removal and reconstruction of the storm drain system and restoration of asphalt and concrete areas.